Table Of Contents

Solar Panel Installation Time

Installing solar offers several benefits for businesses and individuals. The benefits of solar power often far outweigh installation and maintenance costs. You can also earn credits from unused or partially used power by selling it back to the utility company or to your neighbour and earn some revenue.

Anyone who has not handled solar power may want to know the installation process. Specifically, you may want an answer to the question, "how long does it take to install solar power?". This article will highlight some benefits of solar power aside from answering the above question.

You will also learn more about the solar installation process, solar grid connection requirements, incentives, and the benefits of solar panels. Additionally, we will cover choosing the best solar PV system, the role of solar batteries in solar installs, and the generating power from solar panels. Finally, this article will highlight reasons to hire solar installation experts.

How Long Does Solar Panel Installation Take?

Installing solar panels does not take so much time for experienced solar companies. For instance, solar panels are installed on your roof within a few hours. They may not even need to have you to be at home if you have pressing engagements.

However, you may need to give the solar panel installation company access to specific areas of your home during installation. The entire process can range anywhere from four to six hours. However, the duration may vary depending on the type of solar panel and the solar panel system size.

Benefits Of Solar Power

Here are some common benefits of solar power.

  • Installing solar panels helps reduce electrical bills, lowers heating and air conditioning costs, and provides free energy.
  • It increases the value of homes.
  • It is a great way to conserve the environment.
  • You get to reduce your reliance on the electrical grid.
  • Solar installs help reduce the consumption of non-renewable energy sources.

The Process Of Installing Solar Panels

The solar installation process involves several necessary steps. First, do your research. Second, book a panel installation. After that, you get the solar panels installed. From booking a solar panel to installing the system, the period can last a few weeks or several months. The steps to install a solar panel system from start to finish are as follows:

Step One: Choose and contact a solar installer

Do not rush through this step. Find experienced solar power installers to get your system up and running in no time.

Step Two: Site visit and energy evaluation

Your chosen solar installation company will perform a site visit/site assessment. This visit will tell the installer your home's energy needs. Alternatively, the installer may consult Google maps, look at your roof angle and directions, and whether there is shading on your property.

These factors influence the excellent coordination and placement of your residential solar panels. Typically, this procedure can take up to two weeks. Also, solar quotes are issued, and the price is agreed upon at this point.

Step Three: Filing and pulling permits

Your solar company has to file a permit with your local government before installing solar panels. This permit can vary depending on the type of solar panel and your location. The permit pulling process can take one week or a month.

Step Four: Ordering solar equipment

The installer typically orders the solar equipment after they receive the permit. Sometimes, they have equipment in stock. If not, you may have to allow several weeks for the solar panels and equipment to arrive from overseas. Thus, this is a factor that can delay the installation process.

Step Five: The actual installation

The installation is already scheduled at this point. The actual installation consists of the following three parts:

  • Frame installation
  • Installation of panels
  • Connection of the panels to an inverter

Solar companies take up to three days to complete the installation process. Again, this can vary depending on the number, size, and type of solar panels installed. Other factors affecting the installation time include the distance between the solar panel system and the electric meter.

Likewise, installing ground-mounted solar panels takes more time as there is a lot to do here. These factors, like inclement weather, may extend the installation time to several weeks. There may be other property characteristics or necessary upgrades to consider as regards roofing and electrical systems.

Besides, they need to confirm that their system design actually works. Your home may need upgrades such as new electrical panels and roof topping before installing solar panels. These can delay the installation process.

Step Six: Utility/grid interconnections

The solar installation company will submit relevant documents to your local utility company. This process is as regards connecting to the grid and can take between one to two weeks.

The utility company will generally install a bi-directional meter that tracks the amount of energy your system generates. This step extends the utility engagement process to three to six weeks. However, it is certainly worth the wait. You are sure to appreciate reduced energy bills.

Step Seven: Inspections and commissioning

Your local building department and installation company need to conduct a quality control review and inspection. After that, the local utility company will swap out your electrical meter and issue permission to operate (PTO).

The inspection and commissioning process take place in this step. The solar system is tested and switched on. You can see that the solar installation timeline can span a few weeks or several months. As such, plan ahead; it will make your process of switching to solar panels easier.

Requirements For Solar Grid Connections

Permission from the relevant DNSP (Distributed Network Service Provider) is needed to connect your solar system to an electricity network. Here are some requirements to consider when connecting to the grid.

Battery inverter contribution to capacity limit

Different regions may have specific capacity limits for solar inverters. These indicate the contribution that batteries make to the limit. For some areas, battery inverters do not contribute to the phase inverter limit while it does in others.

For inverters above 5kW capacity

You need to get approval from your region's electricity distributor to connect solar panel systems with inverters above 5kW capacity. This distributor is the entity in charge of your region's poles and wires.

Inspection and meter installation

Certain regions like NSW require an Accredited Service Provider (ASP) to inspect your system. They also have to install a meter and switch, then switch the system on.

Process Of Solar Grid Connection

The process of connecting solar energy systems to the mains grid follows these steps:

Note: Your solar installer has to lodge a Connect to Network Application with your electricity distributor.

  • Your installer has to see the approval offer email or letter, Permission to Connect letter, or Job Number (Ausgrid email or letter) before installing the solar system.
  • Next, the solar installation company books the installation.
  • When the solar panels and inverter are fully operational, your installer must give you a completed Certificate of Compliance – Electrical Work (CCEW).
  • This certificate is needed if your meters are to be swapped at some point.
  • Generally, your electricity retailer takes care of meter changeovers. However, some retailers allow your chosen installer to arrange the meter changeover.

Incentives And Benefits For Homes With Solar Panels

Confirm if your home solar panels make you eligible for a federal solar tax credit, solar incentives, or rebates.

Choosing The Best Solar PV System

Knowing the types of solar panels on the market is vital to choosing the right one for your home. Solar panels are categorised as follows:

  • Monocrystalline
  • Polycrystalline
  • Thin-film solar panels

Your choice of a solar PV system and its unique characteristics affects the installation period and cost. A solar professional should give you a good idea of how long your home solar project will take. Whichever type you go for, you will still need final approval, a general electrical permit, a photovoltaic (PV) permit, and/or a construction permit.

How Long To Install Residential Solar Panels?

Residential solar panel system installation may take up to three days. Remember, if it is a grid-tied solar panel system, you need to connect your solar panels to the grid. Your installer's application process to your utility company can take roughly two to three weeks.

Furthermore, you still need to add an extra one to two weeks after installation dates. Typically, that is how long it takes to receive permission to operate (PTO). Installation dates can vary depending on the size of your system. It typically takes a few days longer to get operational permissions.

How Long To Install Commercial Solar Panels?

Installing large commercial solar panels can take most solar companies from one week to several months. As with any type of solar panel, the installation period varies. This timeframe is based on how many panels are needed and the complexity of the installation process.

For instance, older commercial buildings may have concrete roofing. Their greater density and strength increase the time it takes to fix the panels. Older commercial buildings may have concrete roofing. These roofs are denser and stronger, making panel installation much harder.

The Role Of Solar Batteries In Solar Installs

What solar batteries do is store energy - the sun's light. Your solar panels collect the energy and store it in a household battery or battery bank. Households that take advantage of their solar solutions can lower their electrical bills by over 80%.

How Solar Panels Generate Power

One solar panel can provide 245 to 400 W with a minimum of 5 hours of direct sunlight. Basically, this is enough energy to operate a small appliance. You can start generating power for your entire home with a 5-kilowatt solar panel system and battery storage.

Hire Solar Installation Experts

You are now somewhat familiar with the benefits of solar power, the solar installation process, and the requirements for solar grid connection. In addition, you may now be more conversant with the role of solar batteries in solar installs and the generating power of solar panels.

Consequently, you may feel more confident in handling your home solar project as a DIY task. Do not attempt a DIY solar install. If you make a mistake in the solar installation process, your system will not work correctly. Solar panels offer friendly options when it comes to solar panel costs.

You can choose solar companies with competitive solar quotes. Some can even offer financing options and great solar products such as solar inverters. A solar expert is guaranteed to do a high-quality and professional job.

The installation process might include tasks such as replacing your current roof material with solar shingles. Perhaps, you need solar panel removal or solar hot water installations. Most installers can do these jobs as well.